Eagle Island CDF


Location
Wilmington, North Carolina

Type
Heavy Civil Infrastructure

The project will improve Cells 1, 2, and 3 of the Eagle Island CDF. The work consists of expanding the foundation of the existing dike base and modifying and improving the spillway system. Perimeter toe berms will be constructed along the east and west sides of the embankment dike for Cell 2. An internal slump failure in Cell 2 will also be repaired. Spillways 4, 5, and 6 will be replaced with the most current spillway designs. The work in Cell 3 is to complete the raising of the embankment dike between stations 250+00 and 260+00 to 42’ NAVD88. Material required for construction will come from the interior of the Cell 2 diked area. The project includes vegetation clearing from the interior areas of Cells 1 and 2.

 